DECISION DOCUMENT One page before you commit Build proposal: ______________ Author: ______________ Date: ______________ Revisit date: ______________ 1. THE PROBLEM In two sentences, your own words, no vendor terminology: ____________________________________________ 2. THE WORKFLOW Instances per period: ________ Time per instance: ________ Total annual time cost: ________ 3. THE CUT — classify each step: AI (judgment, varies by case) / Automation (same input, same output) / Human (high-stakes, low-volume, or accountability) Steps: ____________________________________________ 4. READINESS The build depends on these capabilities: ______________ Classification: Reliably ready / Almost ready / Not yet Evidence: ____________________________________________ 5. HUMAN PLACEMENT Humans are positioned at: ______________ At each point, what specifically does the human do? ____________________________________________ 6. PROTOTYPE PLAN Start: ________ End: ________ What I'll do manually during it: ______________ What notes I'll keep: ______________ 7. THE DECISION Build / Build smaller / Wait / Don't build Budget gate (if building): ______________ What evidence would change this decision: ____________________________________________ From "Before You Build" - topfiveaitech.com/worksheets